Harborline · Chesapeake, Virginia

Local Notice to Mariners

LNM 02-26 · Seasonal notice

This notice closed on 15 May 2026. It stays posted for reference. Current notices.

Splash dates opened for the spring run

Boats wintered at the yard took first position on the commissioning schedule, with dewinterize, bottom paint, and a systems check booked into one window.

Book a splash date

Notice closed 15 May 2026. Kept posted for reference.

  1. LNM 02-26 (1)

    Dewinterize

    Engines, freshwater systems, and heads brought back up and pressure tested before the lift moved.

  2. LNM 02-26 (2)

    Bottom and running gear

    Bottom paint, anode replacement, and a running gear check while the boat was still in the slings.

  3. LNM 02-26 (3)

    Signed checklist

    The systems checklist went out signed before the boat went back in the water.

Note

The spring run is closed

Fall haul dates are open now. Winter storage customers keep first position on next spring's schedule.

Request a haul date

View