Harborline · Chesapeake, Virginia
Local Notice to Mariners
LNM 02-26 · Seasonal notice
This notice closed on 15 May 2026. It stays posted for reference. Current notices.
Splash dates opened for the spring run
Boats wintered at the yard took first position on the commissioning schedule, with dewinterize, bottom paint, and a systems check booked into one window.
Book a splash dateNotice closed 15 May 2026. Kept posted for reference.
-
LNM 02-26 (1)
Dewinterize
Engines, freshwater systems, and heads brought back up and pressure tested before the lift moved.
-
LNM 02-26 (2)
Bottom and running gear
Bottom paint, anode replacement, and a running gear check while the boat was still in the slings.
-
LNM 02-26 (3)
Signed checklist
The systems checklist went out signed before the boat went back in the water.
Note
The spring run is closed
Fall haul dates are open now. Winter storage customers keep first position on next spring's schedule.